The company successfully delivered the first AEM electrolyzer system

December 20, 2025, the company successfully delivered the first AEM electrolyzer system to China Energy Engineering Group Northwest Institute of Design and Research. The system has passed the third-party inspection and acceptance, with a power consumption of ≤4.3kWh/Nm³ and the ability to adapt to a load fluctuation range of 20% to 120%. Its performance has reached the domestic leading level.

 

Created on:2026-01-27 14:47

NEWS

Serve the global clean energy supply